5-30
5
5.
Connect the positive battery lead to the
terminal
e
, connect the negative battery
lead to the terminal
b
, and then check
the PTT relay for continuity. Replace if
out of specification.
6.
Connect the positive battery lead to the
terminal
f
, connect the negative battery
lead to the terminal
b
, and then check
the PTT relay for continuity. Replace if
out of specification.
7.
Disconnect the special service tool, and
then connect the PTT relay coupler, bat-
tery power source, ground lead, and PTT
motor leads.
Checking the PTT switch
1.
Disconnect the PTT switch coupler
a
.
2.
Measure the input voltage between the
PTT switch coupler terminal and the
ground.
Test harness (2 pins)
1
: 90890-06867
PTT relay continuity:
a
b
c
d
e
f
PTT relay continuity:
a
b
c
d
G/W G
Lg
Sb
1
e
f
d
c
a
b
G/W G
Lg
Sb
1
e
f
d
c
a
b
PTT relay continuity:
a
b
c
d
PTT switch input voltage:
Red (R)–Ground
12.0 V (battery voltage)
Lg
Sb
1
e
f
d
c
a
b
G/W G
a
R
Содержание Kingfish 25
Страница 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Страница 4: ......
Страница 20: ...0 15 GEN INFO General information MEMO...
Страница 45: ...1 25 SPEC Specification MEMO...
Страница 65: ...2 19 TECH FEA Technical features and description MEMO...
Страница 81: ...3 17 RIG GING Rigging information MEMO...
Страница 215: ...7 67 POWR Power unit MEMO...
Страница 229: ...LOWR Lower unit 8 11 0 A...
Страница 242: ...8 24 8 Shimming Shim location T1 T2 T3 T3 A3 B3 42 5 T1 T2 24 0 24 0 B2 A1 A2 B1 Drive shaft and lower case Shimming...
Страница 259: ...LOWR Lower unit 8 41 5 Install new O rings C and D Ball bearing attachment B 90890 06633 A G B C D...
Страница 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Страница 394: ......
Страница 395: ......