![SELT Venetian Blind C80 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/selt/venetian-blind-c80/venetian-blind-c80_technical-and-operational-documentation_1237140033.webp)
DT-E 1.3: SUN PROTECTION SCREEN – VENETIAN BLINDS C80P and C80L
Issue 3 / April 2017 / EN
page 33 / 62
13.
With the use of spirit level set the installation
spot of the second cable guide bracket. Other
steps should be performed in the same order as
when installing the first bracket.
Img. 14
1.
Check if the brackets are installed in a secure manner – their movement apart can cause threat
to people.
2.
After finished installation check the correct functioning of the blind and set end positions
according to the motor manual.
3.
Do not pull cable guides, it might rip them apart or damage the fixing of upper brackets.
4.5.5.
CONCEALED GUIDE RAIL INSTALLATION
Application of concealed side guides is especially recommended for installation of venetian blinds in deep recessed
windows. Using concealed guide rails does not decrease window opening as compared with other kinds of guide rails.
Cover panels for venetian blinds with concealed side guides are made without side covers. Width of cover panels equals
width of window recess.
Fig. 1. Concealed side guide system: 1 – Mounting profile, 2 – Concealed guide rail, 3 – Gasket, 4 – Plaster/ Insulation, 5
– Concrete/ Brick wall