SP LINK | Using SP LINK
76
|
Doc #OI0003 Part #004122 Rev 04 2010
Generator Schedule Start
Some people have predictable times when they require a generator to run, such as when a regular plant
watering routine requires pumps to run, the program contains the ability to pre-determine four different
schedules.
Each of the four Schedules can be enabled or disabled.
Through Schedule x Day you can choose a day of the week, all
weekdays, all weekends or everyday (All).