background image

Version No. 1-2 - 04.06.2021

Doc. No. 9942691001

6 / 17

7. Mounting

Mounting preparations
Several points must be checked before the unit can be mounted. These checks must be made to ensure safety
and the trouble-free operation of the unit. These checks must be carried out with absolute thoroughness to
ensure that the unit works perfectly.

Check unit for transport damages
On delivery the carton box containing the unit must be examined for signs of transport damage. Any transport
damage to the carton box could indicate that the unit itself has been damaged in transit which in the worst case
could mean that the unit will not function.

Location and space requirements
The location of the cabinet must allow for sufficient air circulation to and from the unit.

Attention
Damage to the unit through incorrect mounting. The unit must be mounted according to the mounting template.
It is therefore also important to check, with the help of a spirit-level, that the cabinet is in a horizontal position.
The max. deviation from the vertical or horizontal is 3 degrees.

Air apertures
To provide adequate air circulation and avoid temperature layers from forming, ensure that air inlet and air
outlet are not partially or completely blocked by obstructions in the cabinet. It must also be ensured in
accordance with UL, that the air outlet is not blowing air directly at an equipment operator. Should this be the
case a barrier or duct shall be provided to redirect the airflow.

Sealing
To guarantee that the unit works perfectly ensure that:

the control cabinet is completely sealed to min. IP54 according to EN 60529
a good seal exists between the control cabinet and the unit

Danger through high voltage

Ensure that for the duration of the mounting operation the cabinet is disconnected from the electrical supply.
Therefore take the cabinet out of operation, following the relevant instructions, before mounting work begins
and take all precautions to prevent premature reconnection of the cabinet. When all mounting preparations are
complete the actual mounting operation can commence.

Содержание 42691001

Страница 1: ...3 4 Settings 4 5 Functional Principle 4 6 Technical Data 5 7 Mounting 6 8 Condensate management 8 9 Mounting Principle 9 10 Electrical Connection 10 11 Wiring Diagram 12 12 Taking into Operation 13 13...

Страница 2: ...ons in the instruction manual must be adhered to General danger Indicates compulsory safety regulations which are not covered by a speci c pictogram such as one of the following High electric voltage...

Страница 3: ...d with regards to Safety instructions Instructions on taking the cabinet out of operation Instructions on the prevention of unauthorised cabinet reconnection The electric equipment meets the valid saf...

Страница 4: ...vironmental ratings please refer to the type plate data 5 Functional Principle The cooling unit for enclosures works on the basis of a refrigeration circuit consisting of four main components compress...

Страница 5: ...low Volume System Unimpeded Ambient air circuit 250 650 m h Cabinet air circuit 125 250 m h Mounting Wall mounted Recessed Housing Material Mild steel powder coated Dimension A x B x C D E 600 x 320 x...

Страница 6: ...irit level that the cabinet is in a horizontal position The max deviation from the vertical or horizontal is 3 degrees Air apertures To provide adequate air circulation and avoid temperature layers fr...

Страница 7: ...the surface of the cabinet and remove the mounting template Stick the self adhesive unit seals on the outer surface of the cabinet for externally mounting and on the inner surface of the cabinet for...

Страница 8: ...The condensation drain pipe should be attached as required e g in conditions of high humidity To install an oel cleaning drain 2 pipe please follow below steps Remove the plastic stopper from in the b...

Страница 9: ...4 06 2021 Doc No 9942691001 9 17 9 Mounting Principle Do not use within the rst 15 minutes after installation 1 Mounting gasket 2 Mounting clip 3 M6 slotted set screw 4 Washer 5 Lock nut Fig 1 Recesse...

Страница 10: ...external components it must be ensured that the wiring and connections are double insulated and safe against touch and protected from unauthorized and or accidental external contact Ensure that the co...

Страница 11: ...minals T1 T2 Connect the door contact switch to terminals T1 T2 The contact must be closed when the cabinet door is closed SCCR Refer to UL508A Supplement SB and Seifert Systems document Short Circuit...

Страница 12: ...Version No 1 2 04 06 2021 Doc No 9942691001 12 17 11 Wiring Diagram...

Страница 13: ...on the PC board slightly to the right higher or to the left lower Close the unit in the prescribed manner Check that the new adjusted values meet the necessary requirements If necessary repeat the pr...

Страница 14: ...Install the unit at a di erent place The ambient temperature must be within the stated operating temperature range The control cabinet is not sealed properly The control cabinet needs re sealing Fan o...

Страница 15: ...ction The connections 1 2 and 3 4 are not low voltage 50V Regularly check the condenser pro le for dirt tests approx every 2 000 hours depending on the grade of ambient pollution Should the condenser...

Страница 16: ...fan xing screws Connect the fan cable to the PC board and replace the board if necessary Dispose the old fan according to the environmental laws and regulations 16 Transport Storage Malfunction due t...

Страница 17: ...rt Systems Ltd Seifert Systems Inc Seifert Systems Pty Ltd Albert Einstein Str 3 HF09 10 Wilerstrasse 16 B rnthal 1 Rep O ce 75 Circuit Drive 105 Lewis Road Hal Far Industrial Estate North Kingstown W...

Отзывы: