Section 4: Installation
Installation Procedures
2018 Insta-Berm (Frame) Operations Manual
(Version D)
21
We Engineer Solutions
28. Attach the top rails to the starting corner post
and tighten the set screw to 29 ft-lb. (39 nm).
29. Move to the closest side post to the starting
corner and attach the other end of the top rail
onto the side post. Tighten the set screw.
30. Continue attaching the rails around the entire
berm until you return to your starting point.
If sufficient personnel are available, two
teams can work in opposite directions from
the starting corner.
31. The completed berm should now look like
this.
Tightening the top rail.
Attaching the top rail to the side post.