Radio equipment:
•
Minimum 7-channel radio system and receiver
Recommended Li-Po battery pack for best performance:
•
3400-4S for unlimited 3D performances with approx. 3,5 minutes flight time
•
4000-4S for 3D & precision with approx. 4 minutes flight time
Warning
This RC aircraft is not a toy!
If misused, it can cause serius bodily harm and damage to property. Fly only in
open areas, preferably in official flying sites, following all instructions included
with your radio and motor.
Before starting assembly
Before starting the assebly, remove each part from its bag and protection for a prior
inspection. Closely inspect the fuselage, wing panels, rudder, and stabilizer for
damage. If you find any damage or missing parts, contact the place of purchase.
Warranty information
SebArt garantees this kit to be free from defects in both material and workmanship at
the date of purchase.
This warranty does not cover any parts damage by use or modification, and in no case
shall SebArt’s liability exceed the original cost of the purchased kit.
Further, SebArt reserve the right to change or modify this warranty without notice. In
that SebArt has no control over the final assembly or material used for the final
assembly, no liability shall be assumed or accepted for any damage of the final user-
assembled product. By the act of using the product, the user accepts all resulting
liability.
If the buyer is not prepared to accept the liability associated with the use of this
product, the buyer is advised to return this kit immediately in new and unused
condition to the place of purchase.
INSTALLATION INSTRUCTION
Содержание Mig-29 3D EDF ARF
Страница 4: ...Remove each part from its bag and protection Remove the canopy from the fuselage...
Страница 8: ...Make sure to check the alignment on the top of the wing panel to the fuselage...
Страница 11: ...Apply a light coat of 5 minute epoxy on the stabiliser panel...
Страница 13: ...Hold pressed the stabilizer panel in his position on fuselage...
Страница 14: ...Connect the elevator linkage in servo arm...
Страница 15: ...Connect the elevator linkage at elevator horn Repeat this steps for the other stabiliser panel too...
Страница 16: ...Locate the rudder and connect the rudder servo connector matching the polarity...
Страница 19: ...Install on fuselage the nose cone using 5 minute epoxy...
Страница 21: ......
Страница 23: ...PROGRAMMING EXAMPLE ON JR PROPO RADIO...
Страница 27: ...Use the sub trim to center the elevator servos and if necessary modify the lenght of one side linkage...
Страница 31: ...High rate 100 40 up down High rate 100 30 right left MIXING...