Содержание Mig-29 3D EDF ARF
Страница 4: ...Remove each part from its bag and protection Remove the canopy from the fuselage...
Страница 8: ...Make sure to check the alignment on the top of the wing panel to the fuselage...
Страница 11: ...Apply a light coat of 5 minute epoxy on the stabiliser panel...
Страница 13: ...Hold pressed the stabilizer panel in his position on fuselage...
Страница 14: ...Connect the elevator linkage in servo arm...
Страница 15: ...Connect the elevator linkage at elevator horn Repeat this steps for the other stabiliser panel too...
Страница 16: ...Locate the rudder and connect the rudder servo connector matching the polarity...
Страница 19: ...Install on fuselage the nose cone using 5 minute epoxy...
Страница 21: ......
Страница 23: ...PROGRAMMING EXAMPLE ON JR PROPO RADIO...
Страница 27: ...Use the sub trim to center the elevator servos and if necessary modify the lenght of one side linkage...
Страница 31: ...High rate 100 40 up down High rate 100 30 right left MIXING...