Sealy Reflexion-UP Foundation Скачать руководство пользователя страница 1

A.

B.

C.

E.

F.

D.

Installation

  Before discarding any packing materials, check the 

Refl exion

®

-UP Foundation carton and verify the 

following items in the parts list are included:

PARTS LIST

A.  Wired Remote Control – hard wired to bed (1) 

B.  Connection Y-Cable (1) - (Only on Twin Long, and 

Split CA King)

C.  Mattress Retainer Bar (1)*

D.   Retainer Bar Plate (2)*

E.  Retainer Bar Screw (2)*

F.  9-Volt Batteries (2)

 Installation Instructions

*Attached to foundation for shipping.

Appearance of some parts may differ from photos.

11

TEMPUR SEALY CUSTOMER SERVICE DEPARTMENT: 1–800–499–1965

Содержание Reflexion-UP Foundation

Страница 1: ...RTS LIST A Wired Remote Control hard wired to bed 1 B Connection Y Cable 1 Only on Twin Long and Split CA King C Mattress Retainer Bar 1 D Retainer Bar Plate 2 E Retainer Bar Screw 2 F 9 Volt Batteries 2 Installation Instructions Attached to foundation for shipping Appearance of some parts may differ from photos 11 TEMPUR SEALY CUSTOMER SERVICE DEPARTMENT 1 800 499 1965 ...

Страница 2: ... of the following buttons long enough to illuminate the blue LED backlight on the remote control and watch listen for the foundation to activate This ensures you will be delivering a foundation that is fully functional Test the foundation by pressing the buttons in the following sequence NOTE Only press each button long enough to hear or see the function activate on the foundation 1 Head Lift 2 Fl...

Страница 3: ...e contents STEP 3C Dispose of the packaging materials STEP 3D Keep the user manual at hand for the operators Delivery Procedure STEP 4 Remove the Wired Remote Control from the frame Verify the 2 9 Volt Batteries were installed into the battery compartment of the power supply NOTE Do not mix old and new batteries STEP 5 Connect the power cord from the power supply to the surge protector not include...

Страница 4: ...ttress Retainer Bar C STEP 10A Remove Mattress Retainer Bar C from frame STEP 10B Unscrew Retainer Bar Plate D and Retainer Bar Screw E from frame with screw driver not provided STEP 10C Install Mattress Retainer Bar C and replace Retainer Bar Plate D STEP 10D Tighten Retainer Bar Screw E with screw driver STEP 11 Place the mattress es on the foundation s WARNING When placing the foundation s with...

Страница 5: ...sed together as a single King or CA King system NOTE The use of Frame A and Frame B is for description purposes only and the beds will not actually be labeled Frame A or Frame B NOTE Wired Remote Control and Y Cable are attached to underside of the Reflexion UP Foundation for shipping STEP 1 Carefully unplug the Wired Remote Controls from Frame A and Frame B STEP 2 Remove both Wired Remote Control...

Отзывы: