21
CRACK PRO® HEATED HOSE MACHINE
MACHINE MAINTENANCE
MAINTENANCE SCHEDULE
Follow maintenance procedures listed on the
engine
and
burner
manuals.
MAINTAIN
8
HRS
1
WEEK
1
MONTH
6
MONTHS
1
YEAR
2
YEARS
CHECK ENGINE OIL LEVELS
CHECK HYDRAULIC OIL LEVELS
CHECK DIESEL FUEL LEVELS
CHECK HTO FUEL LEVELS
CHECK IGNITORS
CHECK HITCH BOLTS
CHECK BRAKES
CHECK LUG NUTS
CHANGE HTO OIL
CHANGE HYDRAULIC OIL *
CHANGE HYDRAULIC OIL FILTER
CHANGE DIESEL FILTER
CHANGE PRIMARY CONTROL
CHANGE SOLENOID
CHANGE NOZZLE
DRAIN WATER FROM DIESEL FILTER
CLEAN HYDRAULIC SUCTION STRAINER
CHECK BREAKAWAY BOX BATTERY
CHECK TIRE PRESSURE
TIGHTEN PUMP FLANGES
PACK WHEEL BEARINGS
INSPECT ALL HOSES
* Use a good quality AW68 hydraulic oil with a rating of 352 SUS @100 F. Do not
use a 150 rated hydraulic oil as it is too light.
Содержание CRACK PRO 125
Страница 1: ......
Страница 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Страница 22: ...22 ...
Страница 23: ...23 ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 28: ...28 ...
Страница 29: ...29 ...
Страница 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Страница 58: ...58 CRACK PRO HEATED HOSE MACHINE APPLIES TO ALL DIESEL FUEL BURNERS PARTS LIST PICTURE DIESEL BURNER 28 29 25 ...
Страница 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Страница 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...