background image

4.  ASSEMBLY

 NOTE: 

Heavy item - get assistance to assemble.

4.1.   

 

Securely attach hanger (fig.1 - item 4) using screws (fig.1 - item 3).

4.2.    

Place neoprene pad spacers (fig.1 - item 6) (5 x 40 x 80) near lower edge of locker. (see fig.3). The spacer pads have adhesive backs  

 

to enable fixing. See fig.3.

4.3.    

Hang the locker onto the side of the cabinet.

4.4.    

Attach connector (fig.1 - item 2) to the side of the locker using the bolts (fig.1 - item 1). See fig.2.

4.5.    

To support shelves, insert shelf supports (fig.1 - item 9) at the desired height making sure that all pairs are at the same level. See fig.4.

Original Language Version

© Jack Sealey Limited

fig.3

Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR

 01284 757500 

 01284 703534 

 [email protected] 

 www.sealey.co.uk

ENVIRONMENT PROTECTION

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 
according to local regulations.

Note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior 

notice.

Important

: No Liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

PTB39003.V2       Issue 1   25/11/20

fig.4

fig.2

Connecting piece

M6 x 16 Hex bolt

Отзывы: