5.7 Webbing the Coater
The webbing process will require approximately 6-8ft (2.7m) of leader
material.
Locking Pin
Ensure that the coater is in PRE-HEAT Mode.
Load a blank tube onto the Take-Up Roller by removing the
Locking Pin, lifting the roller and sliding the tube into position
(the position of the blank tube from each end of the Take-Up
Roller needs to be the
same as
the loaded substrate on the
Unwind Roller).
After loading the tube return the roller to its cradle and replace
the Locking Pin.
Pull substrate over the top of the Web Idler Roller and under the Draw-
Down Applicator (see Figure 19). Ensure that the substrate edge is being
webbed straight and perpendicular to the Web Idler Roller directly above
the Unwind Roller.
Figure 18:
Take-Up Roller
Tighten the Tension Control Knob (clockwise) to add a small amount of
tension to the Unwind Roller - may make webbing the coater easier.
Pull the substrate under the Dryer Panel to the Take-Up Roller.
From the back of the machine, pull the substrate square and then tape the
edge securely to the blank tub on the Take-Up Roller. Make sure that the
material is not wrinkled or misaligned.
It is important to get the material as straight as possible and square to the
rollers, to ensure a minimal amount of “telescoping” on the Take-Up Roller.
22
Содержание AquaSEAL SW-2600
Страница 3: ...Seal Brands the finishing touch AquaSEAL SW 2600 SW 3300 Manual Status OMSW26_33 Rev D June 2005 I ...
Страница 4: ......
Страница 43: ...Notes 31 33 ...