Section 5 - Operating Procedure
5.1 General
Outline
The following Section outlines general procedures for job set-up and
describes specific operation functions used when running the coater.
All operating functions are initiated at the Control Panel. Operators should
have reviewed Section 2.2 before operation.
5.2
Tools & Supplies Required
Absorbent towels, soft, lint-free, disposable.
3M Doodle Bug or similar soft Teflon scrub pad.
Lab coat or smock.
Rubber
gloves.
Long neck funnel.
Hose (3 ft hose provided with accessory kit).
5.3
Pre-heating the coater
Switch machine ON at the Control Panel Switch. The coater will power-up
with the Dryer Panel and Draw-Down Applicator in the UP position.
On the Temperature Control Display (see Section 2.2.3), press and hold
the star key to check the set-point temperature. Adjust the set-point
temperature (measured by internal thermocouples) by holding the star
key down and using the up and down arrow keys to set the desired
temperature.
NOTE:
Most super-wide substrates run well with a set-point temperature of 205 - 315°C
(400 – 600°F), depending on speed. This is a basic recommendation only - run adequate
tests to confirm settings for best results.
Press the Pre-Heat/Run Switch on the Control Panel to PRE-HEAT to
begin heating the coater.
18
Содержание AquaSEAL SW-2600
Страница 3: ...Seal Brands the finishing touch AquaSEAL SW 2600 SW 3300 Manual Status OMSW26_33 Rev D June 2005 I ...
Страница 4: ......
Страница 43: ...Notes 31 33 ...