background image

4–TEC SC Models

SET-UP

Install the battery vent tube.

WARNING

Ensure vent tube is not kinked or obstructed.
Battery vent tube must be properly installed.

Venturi

1

F08A076

Secure the lower portion of the venturi [[[[1]]]] with:

- 2 hexagonal bolts from section no. 1 of

predelivery kit.

- 2 lock washers from section no. 1 of predelivery

kit.

- Two 8 mm flat washers (previously removed).

Torque to 21

N•m (

15

lbf•ft)

.

Access Door

1

F02L3X7

Open the front storage compartment cover.

Remove the storage tray.

Secure the access door [[[[1]]]] with:

- 7 plastic darts from section no. 2 of predelivery

kit.

- 4 plastic darts are already in place.

FINAL PREPARATION

Steering Alignment

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::

All adjustments have already been

performed at the factory. If readjustments is
needed, the following procedures should be used.

Check steering alignment as per procedure in the
appropriate

Sea-Doo Shop Manual

.

Predelivery

2004-1

5 / 15

Содержание Bombardier GTX 4-TEC

Страница 1: ...ri 5 Access Door 5 FINAL PREPARATION 5 Steering Alignment 5 O P A S System Alignment 6 Recommended Fuel 6 Fuel System Pressurization 7 Coolant Level 7 Watercraft Identification 8 Programming Keys With...

Страница 2: ...tions and or specifications in this document Bombardier reserves the right at any time to discontinue or change specifications designs features models or equipment without incurring obligation The ill...

Страница 3: ...t or back of the watercraft Raise cover vertically 2 from both ends at the same time Remove parts from the watercraft s rear storage compartment Lifting the watercraft 1 3 2 F08A056 Cut strapping at w...

Страница 4: ...flat washer from section no 1 of predelivery kit 1 nut from section no 1 of predelivery kit Secure the BLACK negative cable to the battery negative post with 1 hexagonal bolt from section no 1 of pre...

Страница 5: ...eviously removed Torque to 21 N m 15 lbf ft Access Door 1 F02L3X7 Open the front storage compartment cover Remove the storage tray Secure the access door 1 with 7 plastic darts from section no 2 of pr...

Страница 6: ...uel Fuel type RECOMMENDED Premium unleaded gasoline with 91 octane RON MON 2 specification for optimum performance MINIMUM Regular unleaded gasoline with 87 octane RON MON 2 specification At predelive...

Страница 7: ...System Pressurization WARNING At PDI whenever doing any type of repair on the watercraft or if any components of the fuel system are disconnected a pressure test must be done before starting the engi...

Страница 8: ...watercraft identification or to program a safety lanyard use Bombardier Utility and Diagnostic Software B U D S in conjunction with the VCK N N N NO O O OT T T TE E E E Make sure to use B U D S versio...

Страница 9: ...ea Doo Learning Key white key with Sea Doo LK written on it click on ADD LEARNING KEY 2 button on bottom of screen N N N NO O O OT T T TE E E E This key limits vehicle top speed to approximately 55 km...

Страница 10: ...TION Never run engine longer than 5 minutes Drive line seal has no cooling when watercraft is out of water 1 3 2 F18D2N6 Reinstall dipstick push in completely Remove dipstick and read oil level It sho...

Страница 11: ...late s a slight play should be obtained With the throttle lever released it must have a free play of 0 5 4 mm 1 64 5 32 in in the cable CAUTION Improper cable adjustment will cause strain on cable and...

Страница 12: ...pump and engine Complete Predelivery Check List Test run watercraft DELIVERY TO CUSTOMER Decal Protective Films N N N NO O O OT T T TE E E E Protective film on decals must be removed Slowly peel off p...

Страница 13: ...ety lanyard 2 or 3 times to initially feed the fuel system Handlebar Tag N N N NO O O OT T T TE E E E A tag is tied to the handlebar Let it in place until delivery and make sure purchaser reads it Bre...

Страница 14: ...ition TPS 1 6 k 2 4 k Crankshaft Position CPS 190 290 Manifold Air Temperature MATS 2 280 k 2 740 k 20C Water Temperature WTS 2 280 k 2 740 k Manifold Air Pressure MAPS 6040 terminals 2 1 5554 termina...

Страница 15: ...ing Nozzle Pivoting Angle 0 to 20 Minimum Required Water Level 90 cm 35 in Outside Diameter 155 3 mm 6 115 in Impeller Material Stainless steel L L L LI I I IQ Q Q QU U U UI I I ID D D DS S S S Fuel T...

Отзывы: