RELEASE PLUS
13.2.
Grease the hinge (A) and mount the release system under
the leaf device using the 5 furnished screws (Fig. 42).
Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
®
Fig. 38
Fig. 40
2
Fig. 39
Fig. 41
A
12. I
INSTALLATION OF THE OPERATOR IN
THE CARRYING BOX
12.1.
Insert manually the operator
into the
carrying box (Fig. 38)
also insert the splined shaft of the operator into the splined bush
of the box and fix the operator with the special screws as in
Fig.40.
N.B.
: It is advisable to weld the crank with the crank shaft after
having also installed the Jack, to use the whole available run and
the point of beginning of the desired slowdown (version with
hydraulic slowdown).
Before welding, make sure that one of the level of the crank shaft
corresponds with a side of the crank (see fig.39 and 40) to
guarantee the maximum angle with the mechanical stops Kit.
N.B.
: If the Jack is not installed immediately but in a second time,
it is recommended to weld the crank shaft and the crank during
the installation of the Jack.
Carry out the electrical connections to the control unit as
described in the instructions supplied with SEA control unit.
Fig. 42
A
Fig. 43
1
ENGLISH
Release
Release Plus
14. ADJUSTABLE MECHANICAL STOPS
20
67411740
12.1.
Connect the hydraulic tubes with the hydraulic unit and the
jack (Fig.21, Fig.22, Fig.23).
After the installation of the above mentioned carrying box, of the
gate and the operator, try to move the gate slowly by hand
verifying that there are no irregular frictions and that the
movement is uniform for the whole range.
Notice:
To do this last operation, release the operator as
described in the related paragraph.
13. RELEASE MOUNTING
For the Jack are foreseen two types of release:
RELEASE (with personalised key) and RELEASE PLUS
(with DIN key).
RELEASE
13.1.
Grease the hinge (A) and mount the release system
under the leaf device using the 4 furnished screws (Fig. 41)
REV 01 - 03/2015
Содержание JACK 1200
Страница 19: ......