background image

Sistemi Elettronici

di Apertura Porte e Cancelli

International registered trademark n. 804888

®

Fig. 34

Fig. 33

Fig. 37

55 mm min.

Fig. 36

11. LEAF ASSEMBLING ON CARRYING BOX

Before installing the gate make sure that the concrete has 
hardened into the foundation hole.

11.1. 

Position the leaf of the gate on the leaf device making 

reference to the rotation axe of   the leaf   hinge (Fig. 34);

11.2. 

Weld with care the leaf device to the leaf of the gate 

realizing a tract fixation of ca. 3-4 cm along the surface of the 
contact, avoiding the welding next to the threaded holes, 

Fig. 32

10.4. 

Introduce the buckle of creeping in the box and fix it with 

the special screws (Fig. 33).         

10.5.

 Insert the units as in Fig. 33. 

N.B.: During the insertion of the units lubricate 
them with 

the supplied grease.

furthermore it is necessary to respect the perpendicularity to the 
axe of rotation (Fig. 35) 

Fig. 35

11.3. 

Be careful not to place the leaf outside the axis (Fig. 16 

and 17), but make sure the shaft corresponds to the hinge 
rotation axis remembering that the minimum distance from the 
pillar is 55 mm (Fig. 37).

ENGLISH

Leaf device

Leaf rotation axe

Leaf

Crank shaft

Crank

19

67411740

REV 01 - 03/2015

Содержание JACK 1200

Страница 1: ...eramo ITALY Tel 0861 588341 r a Fax 0861 588344 Sistemi Elettronici di Apertura Porte e Cancelli International registered trademark n 804888 67411740 Operatore oleodinamico interrato Underground hydra...

Страница 2: ...ons with slow down only The wheeling unit is composed by a double piston connected to a rack which engages with the pinion of the leaf dragging shaft Gates up to 2 meters long can be securely locked u...

Страница 3: ...er hinge alone is sufficient to install the unit those which are unnecessary can be eliminated the lower and that in the middle if exists E as the limit switches are not provided within the actuator i...

Страница 4: ...a level to make it perfectly horizontal to the ground Fig 10 and perpendicular to the axis of the gate Fig 11 Hydraulic tubes sheath Hydraulic unit Pivot Bush U shaped bar Leaf 4 MOUNTING OF THE LEAF...

Страница 5: ...xis of the jack 5 H Y D R A U L I C U N I T B O X WA L L INSTALLATION Fig 19 5 1 Connect the hydraulic tubes with the hydraulic unit and the jack Fig 21 Fig 22 Fig 23 After having installed the box th...

Страница 6: ...o g F Yellow e t n m t s i u n j d c a lo e s c r i n o g F Braking regulation screw Opening closing Blocking screw for braking regulation 17 67411740 Copper tube Flexible tube 6 BLEED CAPREPLACEMENT...

Страница 7: ...m the hydraulic circuit until non emulsified oil appears d tighten the air bleed screw before the operator completes the opening cycle e command closing of the gate f during closing of the gate loosen...

Страница 8: ...ong the surface of the contact avoiding the welding next to the threaded holes Fig 32 10 4 Introduce the buckle of creeping in the box and fix it with the special screws Fig 33 10 5 Insert the units a...

Страница 9: ...th the mechanical stops Kit N B If the Jack is not installed immediately but in a second time it is recommended to weld the crank shaft and the crank during the installation of the Jack Carry out the...

Страница 10: ...XAMINATION The points pointed by arrows in Fig 52 are potentially dangerous The installer must take a thorough risk examination to prevent crushing conveying cutting grappling trapping so as to guaran...

Страница 11: ...he release function Verify the slowdown regulation where present Check the correct drain of the rainwater Check the integrity of the connection cables Grease all the moving parts Grease the rotation a...

Страница 12: ...against the external of the release making come out the handle of the lock until it reaches the stop Fig 57 Move the leaf and make return the handle of the release in its original position and extract...

Страница 13: ...iportata sull operatore La garanzia di base 36 mesi sar estesa per ulteriori 24 mesi fino ad un totale di 60 mesi qualora venga acquistato il certificato di garanzie che dovr essere compilato e risped...

Страница 14: ...the operator PLATINUM The mechanical components of the operators belonging to this line are guaranteed for 36 months from the date of manufacturing written on the operator The base warranty 36 months...

Страница 15: ...sed by improper use or different use in respect to the intended one 4 The mechanical parts must be comply with Directives Machine Regulation 2006 42 CE and following adjustments Low Tension 2006 95 CE...

Страница 16: ...ando la puerta est completamente abierta 15 Todo el mantenimiento reparaci n o controles deber n ser realizados por personal cualificado Evitar cualquier intente a reparar o ajustar En caso de necesit...

Страница 17: ...highest quality levels and for your complete satisfaction Thanks for choosing SEA Este articulo ha sido producido siguiendo rigidos procedimientos de elaboracion y ha sido probando singolarmente a fi...

Страница 18: ..._________________________________ Nome e Cognome First and Family Name_________________________________ Indirizzo Address ____________________________________________________ INSTALLATORE INSTALLER Fi...

Страница 19: ......

Страница 20: ...A Zona industriale 64020 S ATTO Teramo ITALY Tel 0861 588341 r a Fax 0861 588344 www seateam com seacom seateam com Sistemi Elettronici di Apertura Porte e Cancelli International registered trademark...

Отзывы: