32
5.2
HeBel inStallation
step 1: base
Lay a masonry base, minimum 75mm thick (ie. solid bricks).
the base should be laid on a adequate ground supporting it’s
weight.
step 2: baCk wall
Using masonry, construct the back wall from the base to the
top of the ceiling.
step 3: sheet metal layer
(optional step)
place a thin piece of sheet metal on top of the bricks in order to
level the base and safely manoeuvre the firebox.
allow a minimum of 100mm on all sides if possible.
Содержание epi950
Страница 5: ...5 ...
Страница 50: ...50 ...
Страница 56: ...56 1300 851 304 info sculptfireplaces com au PO Box 1232 Mornington VIC 3931 Edition 25 05 17 ...