
Page 15
4.5 MACHINE START-UP
Before starting this machine, take the time to review the operator’s manual thoroughly, to familiarize
yourself with all of the functions of the machine.
We strongly urge you to follow OSHA directive CFR-1910.147 (effective 09-09-90) regarding lock-out,
tag-out procedures. Keep in mind that the directive refers to all hazardous energy sources, not just
electrical.
On machines equipped with either a power vise or a power down feed, the air supply must also be
disconnected and locked or tagged. Scotchman offers a lock-out switch for this machine as an option, if
your plant is not equipped with lock-out capabilities. If you are interested in this option, REFER TO
SECTION 7.6 or contact your local dealer or the factory.
Do not install a blade on the saw until after it has been powered and cycled several times. TO POWER
MANUAL AND POWER VISE MACHINES, turn the power switch to the ON position and use the
trigger switch mounted in the draw handle to start the motor.
TO POWER MACHINES EQUIPPED WITH THE POWER DOWN FEED OPTION, turn the power
switch ON. Once the contactor has been energized, it will remain energized until the machine is
disconnected from the power source or until the emergency stop switch is depressed.
We do not recommend using the emergency stop switch to turn the machine off during normal operation.
If the emergency stop switch is used, it must be reset by manually pulling the switch back out. Always
turn the power switch to the OFF position when the saw is not in use.
Once the machine has been powered, check the rotation of the spindle. There is an arrow on the guard
showing the proper rotation. If the rotation is not correct, the electrician will have to switch two of the
three line wires.
If the saw is equipped with either the power vise or the power down feed options, SEE SECTIONS 7.1 &
7.2C, for additional information on electrical and air connections.
Содержание B2153NF
Страница 10: ...FIGURE 1 A B C G H I F VISE D E FIGURE 1 Page 9 A B C G H I F VISE D E...
Страница 11: ...Page 10 4 2 MACHINE MOVING PROCEDURES SEE FIGURE 2 BELOW FIGURE 2...
Страница 14: ...Page 13 CPO 350 NF PK PD FIGURE 3B...
Страница 18: ...Page 17 FIGURE 4 FIGURE 5...
Страница 20: ...Page 19 FIGURE 6...
Страница 23: ...Page 22 6 0 MACHINE OPERATION 6 1 INSTALLING BLADES MANUAL MACHINES SEE FIGURE 7 BELOW FIGURE 7...
Страница 28: ...Page 27 FIGURE 9 FIGURE 10...
Страница 30: ...Page 29 FIGURE 11...
Страница 34: ...Page 33 FIGURE 13...
Страница 36: ...Page 35 FIGURE 14...
Страница 38: ...Page 37 FIGURE 15...
Страница 40: ...Page 39 FIGURE 16...
Страница 42: ...Page 41 FIGURE 17...
Страница 44: ...Page 43 FIGURE 18...
Страница 46: ...Page 45 FIGURE 19...
Страница 48: ...Page 47 FIGURE 20...
Страница 50: ...Page 49 FIGURE 21...
Страница 58: ...FIGURE 24 Page 57...
Страница 62: ...Page 61 FIGURE 26...
Страница 66: ...Page 65 FIGURE 28...
Страница 68: ...FIGURE 29 Page 67 Q P R S N M O L K J I H G F E D C B A 660255 660255...
Страница 70: ...Page 69 FIGURE 30 SERIAL S B1823NF0709 UP...
Страница 74: ...Page 73 FIGURE 32...
Страница 76: ...FIGURE 33 Page 75 From Item T tee to Item D flow control Valve is 96...
Страница 78: ...Page 77 FIGURE 34...
Страница 80: ...Page 79 FIGURE 35...
Страница 82: ...Page 81 FIGURE 36...
Страница 84: ...Page 83 FIGURE 37...
Страница 86: ...Page 85 FIGURE 38...