8
Operating Instructions
3.1
Open-package inspection
Open-package inspection aims to confirm the completeness of associated parts and
the compliance of anti-tilt marks. The packing list is given below:
Name
Qty.
Main unit
1
Power line
1
Operating Instructions
1
Connection pipeline
2
Table 2
If you find any damage on the packing, please specify the damage after receipt. If you
find any internal damage after unpacking, please contact your local supplier or
manufacturer.
Note:
Leave
the instrument still for 24 hours without connecting to power
supply.
If you find any visible damage on the product, please don’t
connect the product to power supply.