![SCIEX NanoSpray Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/sciex/nanospray/nanospray_operators-manual_1217533055.webp)
Figure 6-5 Interface Contacts and Retaining Pins
Description
Item
Retaining pins
1
Contact pins
2
3. Holding the interface components with both hands, insert the retaining pins in the clamps, and then push the
assembly firmly into place. If the interface components are properly aligned then a click is heard as the retaining
pins are pushed into position.
NanoSpray
®
Ion Source
Operator Guide
55 / 92
RUO-IDV-05-0811-F
Ion Source Maintenance