SCIEX CESI 8000 Plus Скачать руководство пользователя страница 19

Before the Installation

Before the CESI 8000 Plus system can be installed, the mass spectrometer must be operational. To demonstrate
this, a performance test should be performed and a printout of the results attached to this document.

For some mass spectrometers, additional equipment is required, refer to the appropriate section below.

During the Installation

During the installation, a person who is familiar with the operation of the mass spectrometer should be available
to operate the system.

SCIEX Mass Spectrometers

For the OptiMS Adapter for SCIEX NanoSpray III source (PN B07363), all systems require the NanoSpray

®

 III ion

source retrofit kit (PN 5030793), purchased from SCIEX.

Make sure that the required orifice plate for the NanoSpray

®

 ion source is present (refer to the following table).

Orifice Plate

Part Number

NanoSpray

®

 III Ion

Source Part Number

Model

1033731

5028129

SCIEX Triple Quad

TM

 5500 system

QTRAP

®

 5500 system

TripleTOF

®

 4600, 5600, and 5600+ systems

1033731

5029154

TripleTOF

®

 6600 system

5018950

5028138

SCIEX Triple Quad

TM

 6500 and 6500+ systems

QTRAP

®

 6500 and 6500+ systems

Thermo Scientific Mass Spectrometers

For the OptiMS Adapter for Thermo Nanospray II MS Sources (PN B07366), make sure the additional required
equipment is present (refer to the following table).

Additional Required Equipment

Ion Source

Model

Ion MAX adapter

Nanospray II ion source

LCQ Deca XP MAX, LTQ series and the TSQ
series systems

Adapter ring

Nanospray II ion source

LCQ Deca XP and LCQ Advantage XP systems

For the OptiMS Thermo MS Adapter for Nanospray Flex and Nanospray Flex NG Sources (PN B83386), no additional
equipment is required.

CESI 8000 Plus High Performance

Separation-ESI Module

Site Planning Guide

19 / 21

RUO-IDV-05-3345-C | B11953AF

Site Requirements

Содержание CESI 8000 Plus

Страница 1: ...CESI 8000 Plus High Performance Separation ESI Module Site Planning Guide October 2018 RUO IDV 05 3345 C B11953AF...

Страница 2: ...oes not imply any right and or license to use or permit others to use such manufacturers and or their product names as trademarks SCIEX warranties are limited to those express warranties provided at t...

Страница 3: ...mation 11 Customer Profile 11 Comments and Exceptions 12 Signoff 12 A Site Requirements 13 Site Layout Requirements 13 Laboratory Layout and Clearances 13 Weights and Dimensions 14 Electrical Requirem...

Страница 4: ...Only 18 SCIEX Mass Spectrometers 19 Thermo Scientific Mass Spectrometers 19 Bruker Mass Spectrometers 20 Waters Mass Spectrometers 20 B Equipment Safety Categories 21 Site Planning Guide CESI 8000 Pl...

Страница 5: ...ste Collection Requirements on page 8 Verify that the requirements for the operating environment are met Refer to Environmental Requirements on page 16 Verify that the requirements for the computer an...

Страница 6: ...t the CE system Follow established safe lifting procedures Refer to the Site Planning Guide for the weights of system components The FSE unpacks the system with the assistance of customer staff sets u...

Страница 7: ...Postal code State Province Region Country Telephone E mail address Requirements Site Layout Refer to Site Layout Requirements on page 13 CESI 8000 Plus High Performance Separation ESI Module Site Plan...

Страница 8: ...te Do not use extension cords The mains supply voltage does not fluctuate more than 10 from the nominal voltage The mains supply includes a correctly installed protective earth conductor A qualified e...

Страница 9: ...ptional An active tested LAN connection is available Mass Spectrometer Requirements CESI MS Systems Only If the CESI 8000 Plus system will be used stand alone then select the check box and do not comp...

Страница 10: ...equired solutions and bottles are available Customer Preparation Refer to Customer Preparation Requirements on page 18 N A Complete Requirement Up to two customers have been identified for familiariza...

Страница 11: ...tomer Profile Optional To allow the FSE to provide site specific familiarization enter the following information Number of operators Years of experience with mass spectrometry Years of experience with...

Страница 12: ...tallation requirements as specified in this document have been met Completion date yyyy mm dd Site planner signature Return date yyyy mm dd FSE name FSE e mail Site Planning Guide CESI 8000 Plus High...

Страница 13: ...refrigerators or centrifuges For configurations where the CESI 8000 Plus controller is connected to the mass spectrometer acquisition computer with a 4 3 m 14 feet cable the maximum distance between...

Страница 14: ...of the inlet is outside of this range the customer must provide a table or stand for the CESI 8000 Plus system Weights and Dimensions Refer to the following table for weights and dimensions and make...

Страница 15: ...he mains supply outlet Mains Supply Fluctuations The CESI 8000 Plus system requires consistent voltage between 100 VAC to 240 VAC Protective Earth Conductor WARNING Electrical Shock Hazard Do not inte...

Страница 16: ...ts Refer to the Laboratories chapter in ASHRAE 2011 Handbook HVAC Applications for recommended laboratory ventilation guidance Waste Collection Requirements WARNING Biohazard Toxic Chemical Hazard Fol...

Страница 17: ...CAUTION Potential System Damage Other than security software do not install additional software on the controller Changes to the configured software could void the system warranty and cause the system...

Страница 18: ...r equivalent 0 1 N HCl Sigma PN 84428 or equivalent 0 1 N NaOH SCIEX PN 338424 or equivalent 7 5 M ammonium acetate Sigma PN A2706 Glacial acetic acid Sigma PN A6283 or equivalent Methanol Fisher PN A...

Страница 19: ...lowing table Orifice Plate Part Number NanoSpray III Ion Source Part Number Model 1033731 5028129 SCIEX Triple Quad TM 5500 system QTRAP 5500 system TripleTOF 4600 5600 and 5600 systems 1033731 502915...

Страница 20: ...e close to the ground the CESI 8000 Plus system requires a low table or stand Refer to Height Requirements CESI MS Systems Only Waters Mass Spectrometers No additional equipment from Waters is require...

Страница 21: ...2 rating include laboratories and sales and commercial areas For more information refer to the International Electrotechnical Commission standards IEC 61010 1 and IEC 60364 CESI 8000 Plus High Perform...

Отзывы: