Maintenance
SPB Operation Manual
Changing boom pipe
When the boom pipe is originally installed at the factory,
the location of the elbows at each of the pivot points is
determined by means of a special centering tool. The
pipeline is always installed stress-free while the boom
is in the folded or “transport” position. Putting pipes on
incorrectly can put excessive strain on the boom and
can cause damage to pipe arms.
If you intend to change several sections of pipe, always
replace them one at a time and in sequence. Measure
and mark each piece as it is removed and replace it with
a pipe of exactly the same length.
Do not dismantle the complete pipeline. If you are forced
to do so, the elbows at each articulation will once again
need to be centered properly. This should only be done
by trained personnel, using the proper tools.
• Always install new or like new pipeline on the
boom.
• Use new gaskets and pins in the clamps
• Clean and check the clamps carefully and grease
them before re-installing.
The clamps and gaskets should be greased with
a lubricant compatible with rubber. The grease
should be a water resistant, heavy-duty, lithium/
calcium based.
Time-related Maintenance
Periodic - structural inspection
A complete structural inspection of the concrete pump,
boom, and outrigger assembly should be performed at
the following intervals:
•
The first five years - at least once per year.
• Five to ten years - every 6 months
• Ten years and older - every 500 working hours or
at least once per year, whichever occurs first.
We, the manufacturer, would like to emphasize
that it is the owner’s responsibility to ensure that
the boom inspections are completed and that
the equipment is operated only under safe con-
ditions.
You may obtain a copy of inspection intervals and pro-
cedures by calling the Schwing America Service De-
partment at (651) 429-0999.
Содержание SPB 28
Страница 2: ......
Страница 4: ......
Страница 8: ...8 Table of Contents SPB Operation Manual...
Страница 10: ......
Страница 16: ...16 Introduction SPB Operation Manual...
Страница 18: ......
Страница 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Страница 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Страница 26: ......
Страница 28: ...28 Safety S 39 41 SX Operation Manual...
Страница 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Страница 122: ...30 Overview S 39 41 SX Operation Manual...
Страница 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Страница 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Страница 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Страница 200: ......
Страница 216: ...124 Appendix SPB Operation Manual...