Commissioning
Introduction
This section provides guidelines for commissioning and testing the SEL-701-1
Monitor.
SEL performs a complete functional check and calibration of each monitor before
it is shipped. This helps to ensure that you receive a monitor that operates correctly and
accurately. Commissioning tests should verify that the monitor is properly connected to
the power system and all auxiliary equipment. Verify control signal inputs and outputs.
Use an ac connection check to verify that the monitor current and voltage inputs are of
the proper magnitude and phase rotation.
Brief functional tests ensure that the monitor settings are correct. It is not
necessary to test every monitor element, timer, and function in these tests.
Содержание SEL-701-1
Страница 16: ...This page intentionally left blank ...
Страница 18: ...This page intentionally left blank ...
Страница 20: ...This page intentionally left blank ...
Страница 34: ...This page intentionally left blank ...
Страница 118: ...This page intentionally left blank ...
Страница 142: ...This page intentionally left blank ...
Страница 196: ...This page intentionally left blank ...
Страница 210: ...This page intentionally left blank ...
Страница 242: ...This page intentionally left blank ...
Страница 384: ...This page intentionally left blank ...
Страница 440: ...This page intentionally left blank ...
Страница 452: ...This page intentionally left blank ...