![SCHUNK SRM 10 Скачать руководство пользователя страница 96](http://html.mh-extra.com/html/schunk/srm-10/srm-10_assembly-and-operating-manual_1216055096.webp)
Maintenance, size 10 - 14
96
12.00 | SRM | Assembly and Operating Manual | en | 1346850
9 Maintenance, size 10 - 14
WARNING
Risk of injury due to unexpected movements!
If the power supply is switched on or residual energy remains in
the system, components can move unexpectedly and cause
serious injuries.
•
Before starting any work on the product: Switch off the power
supply and secure against restarting.
•
Make sure, that no residual energy remains in the system.
9.1 Maintenance interval
CAUTION
Material damage due to hardening lubricants!
Lubricants harden more quickly at temperatures above 60°C,
leading to possible product damage.
•
Reduce the lubricant intervals accordingly.
Interval
(million cycles)
for SRM 10 – 14
Maintenance work
daily
Visually inspect the function of the shock
absorbers,
3
Check that the shock absorbers are working, if
necessary replace shock absorber,
3
Clean all parts thoroughly, check for tightness,
replace seals if necessary,