Commissioning
28
03.00 | MWS | Assembly and Operating Manual | en | 389230
6 Commissioning
CAUTION
Power supply must be switched off during commissioning!
The MWS is operated manually. A distinction is made between
connecting and disconnecting the system.
NOTE
The example shows MWS 20. The handling of MWS 30 is identical.
Connecting
Connecting the MWS
■
Lever at the MWK must be in "open" position.
Ø
Join the change head (MWK) and adapter (MWA) in axial
direction so that the milled grooves at MWA and MWK are
aligned.
Ø
Turn the actuating ring on the lever in the “close” direction until
you feel it lock into place.
✔
The system is now ready for operation. Switch on the power
supply for the connected feed-throughs.