
OPERATION
Titan 5000 Series II 01/22
Operation Section 4-12
© 2022 Alamo Group Inc.
OPERA
T
ION
Hydraulic Cylinder Priming
Hydraulic Cylinder must be filled with hydraulic oil before operating the Titan 5000 bucket or grate. Hydraulic
cylinders and lines are filled by holding the valve control levers in the extended position until the cylinder fully
retracts and extends. Place control levers in the float position and repeat process several more times to purge
all air from the system.
7. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the rock picker and tractor must be performed. This
includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and
functional, and performing needed repairs. Do not operate the rock picker and tractor if the pre-operation
inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and
missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable
down time and repair cost can be avoided.
Never work under the Implement, the framework, or any lifted
component unless the Implement is securely supported or blocked up to
prevent sudden or inadvertent falling which could cause serious injury or
even death.
(SG-43)
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
Содержание Titan 5000 II Series
Страница 4: ......
Страница 7: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Страница 19: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 13 2022 Alamo Group Inc SAFETY Decal Location ...
Страница 21: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 15 2022 Alamo Group Inc SAFETY Decal Description ...
Страница 22: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY ...
Страница 23: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY ...
Страница 24: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 18 2022 Alamo Group Inc SAFETY ...
Страница 25: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 19 2022 Alamo Group Inc SAFETY ...
Страница 26: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 20 2022 Alamo Group Inc SAFETY ...
Страница 27: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY ...
Страница 29: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Страница 34: ......
Страница 35: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Страница 49: ...ASSEMBLY Titan 5000 Series II 01 22 Assembly Section 3 15 2022 Alamo Group Inc ASSEMBLY ...
Страница 62: ......
Страница 63: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Страница 97: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Страница 106: ......
Страница 107: ......
Страница 108: ...Titan 5000 Series II 01 22 P N R801 010C Printed Canada ...