Commissioning
ProLab 4000
24
ba75646e03
12/2012
3.2
Initial commissioning
Perform the following activities:
Insert the batteries (see page 195)
Connect the power pack (see page 24).
Switch on ProLab 4000 (see page 25).
Connect the USB mouse (see page 26)
Setting the language (see page 58)
Set the date and time (see page 59)
Set up the access authorization for user keys (see page 53)
Connect the sensor (see page 27).
3.3
Connecting the power pack
The power pack supplies the meter with low voltage (9 V DC).
The batteries are only used to buffer the system time if the power sup-
ply is interrupted.
CAUTION
The line voltage at the operating site must lie within the input
voltage range of the original power pack (see page 203).
CAUTION
Use original power packs only (see page 203).
1
Insert the plug into the socket of the meter.
2
Connect the original power pack to an easily accessible power
outlet.
The self-test, meter designation, software version and subse-
quently the
Standby
display appear.
Содержание ProLab 4000
Страница 4: ...ProLab 4000 4 ba75646e03 12 2012...
Страница 10: ...Contents ProLab 4000 10 ba75646e03 12 2012...
Страница 20: ...Overview ProLab 4000 20 ba75646e03 12 2012...
Страница 30: ...Commissioning ProLab 4000 30 ba75646e03 12 2012...
Страница 68: ...System functions ProLab 4000 68 ba75646e03 12 2012...
Страница 86: ...pH ProLab 4000 86 ba75646e03 12 2012 Note A calibration line is determined for the two point calibration...
Страница 138: ...Ion concentration ProLab 4000 138 ba75646e03 12 2012...
Страница 184: ...Recorder ProLab 4000 184 ba75646e03 12 2012...
Страница 202: ...What to do if ProLab 4000 202 ba75646e03 12 2012...
Страница 216: ...Lists ProLab 4000 216 ba75646e03 12 2012...
Страница 227: ......