30.30.01.01648/06
www.schmalz.com
EN | 37
6.2.3 Functional Diagram of the Standard Version of the FMHD
Using:
Separating cylinder
“Blow off” function
Two NC control valves
Duration of the “blow off” compressed air pulse
Depending on the workpiece, the blow off process should last for roughly three to
five seconds.
24 V
“Separating cylinder”
EMC
Vo
lta
g
e
0 V
Pretensioning
Applying
suction
Depositing
Time
24 V
“Blow off” EMC
Vo
lta
g
e
0 V
Pretensioning
Applying
suction
Depositing
Idle state
Time
6.2.4 Functional Diagram of FMHD with Ventilation Cylinder
Using:
Separating cylinder
Ventilation cyl
inder instead of “Blow off” function
Two NC control valves
24 V
“Separating cylinder”
EMC
Vo
lta
g
e
0 V
Pretensioning
Applying
suction
Depositing
Idle state
Time
24 V
“Ventilation cylinder” EMC
Vo
lta
g
e
0 V
Pretensioning
Applying suc-
tion
Depositing
Idle state
Time
Содержание FMHD
Страница 60: ...60 EN www schmalz com 30 30 01 01648 06 ...