![Schenker ZEN 30 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/schenker/zen-30/zen-30_installation-use-and-maintenance-manual_1210570031.webp)
5
– FUNCTIONING AND USE
COD.
30Z12/24.B.2021
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
30
5.2.1
Preliminary checks before proceeding with the start-up procedure
Perform the following checks before proceeding with the start-up procedure:
1. Verify all components and hoses are connected correctly.
2. Verify the 5 micron and active carbon cartridges are installed.
3. Check the seawater inlet valve and salt water drain valve (if existing) are open.
4. Check the reset valve is closed (lever
orthogonal
to the body valve) and the positioner completely
unscrewed.
5. Check the fresh water pressurizing pump of the boat is on.
6.
Check the grey valve on the active carbon filter is open.
5.2.2
Start-up
1. Open the depressurization valve (unscrew the
valve).
2. Push Flushing for 5 seconds. The panel
beeps twice, the button flashes quickly and
the procedure starts.
The unit can be stopped at any time by
pushing the ON/OFF button.
3. After about 3 minutes, the unit will stop (the
fresh water system is now purged from air).
Then start the unit again pushing ON/OFF.
4. After 2-3 minutes, close the depressurization
valve. The system starts going under pressure
and the fresh water production begins. Check the
working pressure of the unit is correct (6,5
– 7,5
bar).