VC 1100
Installation and Commissioning
VC1100E/mounting
Version 2
→
© Schenck VIBRO GmbH, D-64273 Darmstadt, November 97
C01 / C02 - C11 / C12
6-1
6 Installation and Commissioning
Installation
VIBROCONTROL 1100
Mount rear side down
Vibration transducers:
Consult transducer manual
Wiring:
Consult chapter 3 of this
manual
Grounding:
Consult grounding
recommendations
See chapters 2 and 3 of this manual for technical data and details
on serial interfacing. Seal unused cable ports using ... AC-xxx.
Commissioning
CAUTION !
The safety instructions are attached as a separate brochure in
different languages.
Check wiring
Check supply voltage
Power Monitor
Enter setup parameters required for this installation
Connect transducers
Once the transducers are con
nected and power is applied,
the OK error must clear show-
ing everything is configured
correctly.
Connect peripheral devices to relays and analog outputs.
Connect serial interfaces as required