background image

 

Table of Contents 

 

draft2go 

BA-49-001-09 

3 von 21 

 

 

Table of Contents 

 

1

 

Foreword ............................................................................................................................. 2

 

2

 

Table of Contents ................................................................................................................. 3

 

3

 

Introduction and basic safety instructions ............................................................................. 4

 

3.1

 

Explanation of signs and symbols .................................................................................. 5

 

4

 

The draft2go dispensing system ............................................................................................ 7

 

4.1

 

Components of the draft2go dispensing system ............................................................ 8

 

5

 

Assembly and commissioning ............................................................................................... 9

 

5.1

 

Explanation of various components .............................................................................. 9

 

5.2

 

Assembling the insulating jacket with KEG .................................................................... 9

 

5.3

 

Assembling the dispensing head ................................................................................. 10

 

5.3.1

 

Tappet and one-way line ............................................................................................................... 10

 

5.3.2

 

Attaching the dispensing head to the draft2go KEG ..................................................................... 10

 

5.3.3

 

Fitting the beer line to the dispensing head ................................................................................. 11

 

5.4

 

Commissioning ........................................................................................................... 14

 

5.5

 

General tips for tapping beer ...................................................................................... 16

 

6

 

Disassembly and Cleaning .................................................................................................. 17

 

6.1

 

Disassembly ............................................................................................................... 17

 

6.2

 

Cleaning ..................................................................................................................... 18

 

6.2.1

 

Cleaning the dispensing head ....................................................................................................... 18

 

6.2.2

 

Cleaning the insulation .................................................................................................................. 19

 

7

 

Beverage residues in the draft2go KEG................................................................................ 20

 

8. Trouble shooting .................................................................................................................... 21

 

Contact: ..................................................................................................................................... 21

 

 

 

Содержание draft2go

Страница 1: ...Foreword draft2go BA 49 001 09 1 von 21 Operating instructions draft2go dispensing system...

Страница 2: ...and in particular the safety instructions must be observed at all times by all people working on or with the draft2go dispensing system In addition all rules and regulations for accident prevention wh...

Страница 3: ...f various components 9 5 2 Assembling the insulating jacket with KEG 9 5 3 Assembling the dispensing head 10 5 3 1 Tappet and one way line 10 5 3 2 Attaching the dispensing head to the draft2go KEG 10...

Страница 4: ...here is absolutely essential to guaran tee the appropriate and error free use of the draft2go system Failure to comply with the operating instructions may result in errors that can damage the dispensi...

Страница 5: ...th the information can lead to material damage as well as slight or moderately serious injury WARNING Indicates a potentially dangerous situation Failure to comply with this instruction can lead to ma...

Страница 6: ...duction and basic safety instructions draft2go BA 49 001 09 6 von 21 Prohibiting signs Prohibited No direct sunlight Warning signs Danger warnings Instructions Information signs Read the instruction m...

Страница 7: ...gas compartment The draft2go dispensing head is made of high quality plastic and all components coming into direct contact with the beer are food safe The flow of beer from the draft2go dispensing he...

Страница 8: ...ft2go set The draft2go KEG is not in cluded in the delivery scope Item KEG Item Insulation Item Dispensing head 1 draft2go KEG 2 1 Insulating base 3 1 Dispensing head 2 2 Drip tray 3 2 Tappet 2 3 Drip...

Страница 9: ...valve Flat fitting 5 2 Assembling the insulating jacket with KEG Place the pre chilled KEG onto the insula tor base so that the NC valve and the re cess in the top ring are in line with the drip tray...

Страница 10: ...sembled 5 3 2 Attaching the dispensing head to the draft2go KEG ATTENTION Always attach the dispensing head so that the flat fitting and the NC valve can be coupled to it Put the two sides of the insu...

Страница 11: ...ed from the front the stainless steel faucet spout must be removed When it is inserted the tappet must be rotated to find the correct position Once this position is found the tappet in dependently sin...

Страница 12: ...e right of centre Then the tube must be pushed into the middle To insert the one way line the tap must be pulled forward By turning the end of the one way line gently to the right and left the tube ad...

Страница 13: ...flexible tube The holding groove ensures that it remains in place see im age Push the one way line s elbow connector into the black connector socket on the tappet until it clicks into place Replace th...

Страница 14: ...ead is locked in the forward position as described in 5 3 2 Now press the lever down until it locks into the tap pet When this happens you will hear it click into place Hold the lever firmly with the...

Страница 15: ...ease buttons in place To check if the lever is closed properly look down on the two release buttons on the right and left of the lever If they are fully visible the lever is in the correct position Th...

Страница 16: ...he spout should not touch the glass the beer or the beer foam VI The angle at which you hold the glass when tapping is decisive for the amount of foam The straighter you hold the glass the more foam w...

Страница 17: ...e of approx 13 kg so never stand with your head directly over the dispensing head Lift the lever upwards To remove the beer line the tap must be pulled forwards When the two release buttons are presse...

Страница 18: ...ately after use If the beer residues are dry please use a soft cloth and standard washing up detergent to clean the dispensing head A new disposable one way line should be used each time the KEG is ch...

Страница 19: ...ntended for use on another occasion always remove the dispensing head clean all parts which were in di rect contact with beer and place the KEG in cold storage Never put a KEG in cold storage with the...

Страница 20: ...by weighing the KEG on suitcase scales for example draft2go KEG Weight Full amount KEG with insulation KEG only Residue and dispensing head 10 litres 16 5 kg 14 5 kg 9 litres 15 5 kg 13 5 kg 8 litres...

Страница 21: ...by visiting https www keg schaefer container systems de de angebot zapfanlage draft2go Otherwise you can contact the person responsible via our Contact page Contact Video tutorial SCH FER Container S...

Отзывы: