REPLACEMENT OF BELT
1.Pull belt tension lever upward.
2.Remove two screws, open the protection cover and
remove the used belt.
3.Locate the new belt on two rollers.
4.Push belt tension lever downward.
5.Rotate belt by hand, meanwhile adjust tracking knob as
a pretest before power test.
6.Locate protection cover then use left hand to control the
switch with a short on/off starting, meanwhile put right
hand on tracking knob for clockwise or counter turning
till the belt runs stably between the two rollers.
7.Check belt tension. If the tension is improper for
working, then begin the adjustment procedures (see
page 4) until the tension is satisfactory.
8.Repeat the procedures of hand test and power test for
belt runs stably between the two rollers.
IMPORTANT NOTICE FOR CE
Handling of Machine
1.The total weight of this machine must be ensured before handling. 2.It is better to handle this machine with the help of
lifting tools.
Environment Requirements for Installation.
1.
Be sure to provide sufficient light for operation according to the codes or regulations published for local area. If you do
not get the information about lighting, a light intensity of 300 Lux is the least value to be supplied.
2.
The place where machine install must be flat and big enough for the operation.
Noise Level
1.
The noise level of this machine is about 75 db(A) during operation.
2.
While taking provisions for the risk of noise, the noise level of working environment should be taken into
consideration also.
Содержание 1220
Страница 2: ...READ THIS MANUAL BEFORE USE DIESE ANLEITUNG VOR DER VERWENDUNG LESEN LÆS DENNE MANUAL FØR ANVENDELSE ...
Страница 16: ...ENG 9 DIAGRAM ...
Страница 19: ...ENG 12 ELECTRICAL CIRCUIT DIAGRAM ...
Страница 31: ...DE 24 DIAGRAMM ...
Страница 34: ...DE 27 ELEKTRISCHER SCALTPLAN ...
Страница 45: ...DK 9 DIAGRAM ...
Страница 48: ...DK 12 ELEKTRISK KREDSKØBSDIAGRAM ...