Fuel system
OPM 320 en-GB
49
©
Scania CV AB 2019, Sweden
Leak testing after mainte-
nance of the fuel circuit
This procedure applies only if pure biogas is
used as fuel.
Special tool
Calibration of the pressure testing
equipment
1.
Connect pressure regulator 2 301 551 to the
compressed air.
2.
Block the connection nipple and open the
pressure regulator valve.
Number
Designation
2 541 520
Pressure testing kit
389 393
38
9 392