![Savch S200 Series Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/savch/s200-series/s200-series_user-manual_1203756066.webp)
62
7.
MAINTENANCE AND AMBIENT ELEMENTS
For safety and normal operation, the inverter shall be provided with daily as well as periodical maintenance.
Diagram below shows items that must be checked.
Check shall only performed 5 minutes after charging LEDs of the inverter go off, to prevent injury to operators
caused by residual power of inverter condenser.
Inspection
item
Inspection content
Inspection
period
Inspection
method
Assessment
base
Corrective
measures to
fault
Daily
Annual
Machine
ambient
environme
nt
Verify ambient
temperature and humidity
○
Measure with
temperature or
humidity meter in
accordance with
notes for
installation
Temperature:-
10 to 40
℃
;
humidity:belo
w 95%RH
Improve
environments
Check stacking with
inflammable materials
○
View inspection
No foreign
materials
Inverter
installing
and
grounding
Check abnormal vibration
to machine
○
View and
auditory
inspection
No foreign
materials
Tighten
securing
screws
Check grounding
resistance complies with
specification
○
Measure
resistance with
three-functional
meter
220V
Class:below
100
Ω;440V
Class:below
100
Ω
Modify
grounding
Input
power
supply
voltage
Check main circuit
voltage
○
Measure
resistance with
three-functional
meter
Voltage value
complies with
specifications
Modify input
power supply
External
terminal
securing
screws of
the inverter
Check security of
screwed parts
○
View inspection
and check
screws are
secured tightly
with screwdriver
All OK
Tighten or
sent for
factory
maintenance
and overhaul
Check terminal board is
not damaged
○
Check no clear rust exists
○
Inverter
inner wiring
Check no distortion
appears
○
View inspection
All OK
Replace or
sent for
factory
maintenance
and overhaul
Check outer shielding is
not broken
○