Savant Power System Wiring and Installation Deployment Guide
Copyright 2022 Savant Systems, Inc
009-2222-02 | 080122
- 6 -
3. Basic System
The subsections within this section depict the basic communication pathway for a Savant Power System. This is the basis of all wiring diagrams beyond this
point and can be used as a way to troubleshoot issues with deployment.
IMPORTANT!:
For energy monitoring Power Systems with
no Power Sources
, choose the subsection below that is applicable to the Savant Host
installed. Then complete section 3 according to the Power Modules installed. No further installation is required.
3.1. Savant Pro Host
–
The
Savant Pro Host
is the brain of the Savant Power System, and is responsible for displaying live data to the Savant Pro App and transmitting user or
installed configured commands to the correct device upon request.
–
The
SSC-0012
, or any
Savant Controller
with a relay connection, is responsible for controlling the auxilliary contacts on the generator or battery ATS.
–
OPTIONAL:
The
Savant Smart Energy Monitor
is responsible for monitoring VT and CT connections and sending information to the Savant Host.
–
The
Panel Bridge Controller
relays commands sent by the Host over Bluetooth to Power Modules.
–
The
Savant Power Panel
contains all
Power Modules
paired with the Panel Bridge Controller and executes all commands sent to it.
VT
CT
RS232
Ethernet
1
2
+
IR
6 +
-
5
- +
4
-
- 1
+
- 2
- +
3
+
G
G
NC C2 NO
NO
C1
NC
RELAY
12 VDC
PD1PD2
/
/
/
/
SSC-0012
Savant Host
Network Switch
1
2
3
4
5
6
7
8
5 VDC
CT CONNECTIONS
+1- +2- +3- +4- +5- +6- +7- +8-
+9- +10- +11- +12- +13- +14- +15- N/A
VT CONNECTIONS
+A- +B- +C-
SmartEnergy Monitor
To Home
Network
To BAT
ATS AUX
Panel Bridge
Controller
Savant Power
Panel
20
o/
O
FF
C
IRC
UIT P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
C
IRC
UIT P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
20
o/
O
FF
20
o/
OFF
20
o/
OFF
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
20
o/
OFF
20
o/
OFF
20
o/
OFF
20
o/
OFF
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
20
o/
OFF
20
o/
OFF
20
o/
OFF
20
o/
OFF
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
20
o/
OFF
20
o/
OFF
20
o/
OFF
20
o/
OFF
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
CI
RCUI
T P
O
WER
ON
A
U
TO
PAIR
A
B
LOAD
ROOM
ROOM
40%
40%
20
o/
OFF
20
o/
OFF
20
o/
OFF
20
o/
OFF