![SANY SY500H Скачать руководство пользователя страница 103](http://html.mh-extra.com/html/sany/sy500h/sy500h_operation-and-maintenance-manual_1198270103.webp)
MACHINE OPERATION
4-33
SY500H Excavator OMM
0000718
Figure 4-66
NOTE:
To aid in correct installation, record the location of
the pins and shims before removing them.
11. Remove the pin and linkages:
• Upper linkage (12)
• Lower linkage (13)
• Lift points (14)
12. Raise the removal system back to its original position
for transport.
13. Shut down the engine.
Counterweight Installation
NOTE:
Make sure that all shims are replaced in the same
locations and are the same type/thickness as
noted during removal.
1. Install the counterweight in the reverse order of
removal.
2. Tighten the mounting fasteners to 2249–2545 ft-lb
(3050–3450 N•m).
0000719
Figure 4-67
3. With the counterweight (1) on the ground, the
distance between the machine and the
counterweight should not exceed 4 ft. (1.2 m).
0000720
Figure 4-68
4. If reassembly is required for the linkage, follow the
pattern shown.
12
13
14
1
Содержание SY500H
Страница 2: ...Page Intentionally Blank ...
Страница 14: ...5 10 SY500H Excavator OMM Page Intentionally Blank ...
Страница 30: ...2 8 SAFETY SY500H Excavator OMM Page Intentionally Blank ...
Страница 70: ...3 40 MACHINE CONTROLS SY500H Excavator OMM Page Intentionally Blank ...
Страница 172: ...5 64 MAINTENANCE SY500H Excavator OMM Page Intentionally Blank ...
Страница 174: ...6 2 SPECIFICATIONS SY500H Excavator OMM Machine Dimensions 0000837 Figure 6 1 1 2 3 4 5 6 7 8 9 10 11 ...
Страница 180: ...6 8 SPECIFICATIONS SY500H Excavator OMM Page Intentionally Blank ...
Страница 194: ...I 8 SY500H Excavator OMM Page Intentionally Blank ...
Страница 195: ...Page Intentionally Blank ...