Maintenance
SY215C LC/SY225C LC Excavator OMM
5-96
Operation and Maintenance Manual — 1219
SANY
NOTE:
Tighten the fasteners in sequence, making sure
the hardware and track shoe are in close
contact with the link mating surface.
Check and Adjust Track Tension
Check Track Tension
1. Prepare the machine for service. See “Maintenance Safety” on page 2-8.
2. Clean the track, rollers, and frame.
3. Drive the machine forward two machine-lengths on a flat, level, stable surface.
4. Park and prepare the machine for service.
5. Lay a taut string or straightedge from the forward carrier roller to the idler.
6. Measure the gap at location (1) (to the top of the track shoe).
Fig. 5-150
1
4
2
3
Fig. 5-149
1
Содержание SY215C LC
Страница 2: ...This Page Intentionally Left Blank ...
Страница 271: ...This Page Intentionally Left Blank ...