Maintenance
SY215C LC/SY225C LC Excavator OMM
5-52
Operation and Maintenance Manual — 1219
SANY
Check the Final Drive
NOTE:
Perform this procedure after the first 50 hours
or week of service, then every 500 hours or 3
months afterwards.
1. Prepare the machine for service. See “Maintenance
2. Relieve hydraulic system pressure. See “Relieve
Hydraulic System Pressure” on page 5-21.
3. Remove the final drive covers (1).
4. Inspect the travel motor (2) to make sure all hoses are
secured.
5. Check for leaks.
6. Make sure all fasteners (3), including the final drive
motor mounting fasteners, are present and tight.
7. Replace any damaged or defective fasteners and tighten
any loose fasteners.
NOTE:
Use anaerobic thread sealant when installing
loose fasteners and installing new fasteners.
Tighten fasteners securely.
8. Install the final drive covers (1).
Fig. 5-61
1
Fig. 5-62
3
2