SY215C LC/SY225C LC Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 1219
5-33
TABLE
O
F
CONTENTS
INTRODUCTION
SAFETY
M
A
CHINE
CO
N
T
RO
L
S
MACHINE
OPE
R
A
T
IO
N
MAINTENANCE
S
PECI
F
ICA
T
IO
NS
OPT
IONAL
EQ
U
IPM
E
N
T
Replace the Bucket
Remove the Bucket
1. Prepare the machine for service. See “Maintenance
2. Lower the bucket to the ground and support the bucket
to prevent it from rolling over when the bucket pin is
removed.
3. Remove the bucket pin hardware and bucket pins (1)
and (2) and remove the bucket (3) from the arm (4) and
linkage (5).
4. Clean the pins and pin bores. Lubricate the pin bores
with grease.
Install the Bucket
1. Align the arm with the new bucket. Make sure the
bucket is secured and will not move.
2. Align the arm and bucket and install the bucket pin. Install the retaining fasteners into the pin.
3. Align the linkage to the bucket and install the bucket pin. Install the retaining fasteners into the pin.
4. Grease the bucket pins at grease fittings.
5. Start the engine and run it at low idle. Operate the bucket by slowly curling it in both directions to check for
binding.
CAUTION!
• Keep fingers and other body parts away from pinch points to prevent crushing injuries
while removing or installing the bucket. Never put your finger into the pin bore during
alignment.
• Secure bucket after removal and before servicing.
• Bucket pins may be ejected with extreme force when removed forcefully. Do not allow
anyone to stand in front of the pins during removal.
• Never stand or place your feet or other body part under the bucket when removing bucket
pins.
Failure to follow these precautions could result in death or serious injury.
Fig. 5-25
1
5
4
2
3
Содержание SY215C LC
Страница 2: ...This Page Intentionally Left Blank ...
Страница 271: ...This Page Intentionally Left Blank ...