SY135C Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 0120
5-101
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
NS
OP
T
IO
N
A
L
EQUI
PMENT
Dozer Blade Linkage Pins and Dozer Blade Cylinder
End Pins
Fig. 5-184
0000515
1
1
2
1
3
4
1. Remove the grease fitting caps (1) from the dozer blade
cylinder base end (2) and rod end (3) grease fittings.
Grease the dozer blade cylinder base end and rod end
grease fittings. Install the grease fitting caps.
2. Remove the grease fitting cap (1) from the dozer pivot
pin grease fitting. Grease the dozer pivot pin grease
fitting (4). Install the grease fitting cap.
NOTE:
The right dozer blade cylinder is shown. The
left side is similar.
Boom Manifold
Fig. 5-185
0000505
1
4
5
2
6
3
1. Remove the grease fitting cap (1) from the left (5) and
right (6) boom pivot grease fittings. Grease the left and
right boom pivot grease fittings. Install the grease fit-
ting caps.
2. Remove the grease fitting cap (1) from the left (4) and
right (2) boom cylinder rod end grease fittings. Grease
the left and right boom cylinder rod end grease fittings.
Install the grease fitting caps.
3. Remove the grease fitting cap (1) from the arm
cylinder base end pin (3) grease fitting. Grease the arm
cylinder base end pin grease fitting. Install the grease
fitting cap.
Содержание SY135C
Страница 2: ...This Page Intentionally Left Blank ...
Страница 256: ...Maintenance SY135C Excavator OMM 5 114 Operation and Maintenance Manual 0120 SANY This Page Intentionally Left Blank ...
Страница 262: ...Specifications SY135C Excavator OMM 6 6 Operation and Maintenance Manual 0120 SANY LIFT CHART Fig 6 3 0003678 ...
Страница 264: ...Specifications SY135C Excavator OMM 6 8 Operation and Maintenance Manual 0120 SANY This Page Intentionally Left Blank ...
Страница 277: ...This Page Intentionally Left Blank ...