S&S Northern Merlin 1000VW+ Скачать руководство пользователя страница 8

Merlin 

 

  

 

 

 

 

 

 

Product Data Sheet 

 

 

 

 

S&S Northern Ltd

  

8  

 Wiring Diagram  

 

 

 

 

 

 

 

 

 

1.  Mains Input 230V Single Phase.  
2.  Gas Solenoid Valve Power Output, 230VAC, Max 3A.  
3.  Electric Contactor Power Output, 230VAC, Max 3A. 
4.  Water Valve Power Output, 230VAC, Max 3A. 
5.  Supply Fan PD Switches terminal, this is disabled on this system. 
6.  Extract Fan PD Switches terminal, this is disabled on this system. 
7.  BMS output contacts. Normally Closed, Common and Normally Open. Max.1A @ 230VAC.  
8.  Gas pressure transducer, Red + positive, Black 

– negative and Blue IN. 

9.  Remote EM Stop buttons and Fire Alarm input wired in series (purchased separately). 

VOLT 

FREE INPUT

  

10.  Methane, CO or LPG Detector, power supply and 

volt free input 

(purchased separately).  

CO2 Monitor (purchased separately). 

VOLT FREE INPUT

 

11.  Fan Switch output (purchased separately). For wiring instruction, see Fan Switch user manual.  
12.  Fan PD Switches terminal (purchased separately). 

VOLT FREE INPUT

 

13.  Permanent 12VDC output when there is power at the panel. 

 

 

 

Please note, Mains wires and low voltage wires should 
not be run in the same conduit as per the 

LOW 

VOLTAGE DIRECTIVE

 

 

 
 

 

 

 

 

 

 

 

 

 

1

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5
3

 

 

6

 

 

 

7

 

 

 

8

 

 

 

9

 

 

 

10

 

 

 

11

 

 

 

L

 

 

 

N

 

E

 

 

 

 

 

Gas Valve

 

 

 

Pressure 

 

Transducer

 

 

 

EM 

 

Stop 

 

Gas Detector/ 
CO2 Monitor

 

3

 

L

 

N

 

E

 

Water Valve

 

4

 

  5              6 

    7          8       9        10         11      12  13      

PD Switches or Current Switches 

(Volt Free)

 

F

A

P

S
W
I
T
C

Содержание Merlin 1000VW+

Страница 1: ...Merlin 1000VW Product Data Sheet S S Northern Ltd 1 Gas Safety Products Merlin 1000VW Gas Proving Electric Water Isolation System Installation operating and maintenance 20 01 2017...

Страница 2: ...as Detected 4 2 11 FS 123 4 2 12 Fan PD Switch 4 2 13 12v DC 4 2 14 Internal Buzzer 4 3 Operation Instructions 4 3 1 How to turn the system on and off 4 3 2 Explanation of LED status 4 Power LED 4 Gas...

Страница 3: ...ally fused at 3 Amps 2 4 Electric Contactor An electrical output will be supplied to an electrical contactor supplied by others This will be internally fused at 3 Amps and should be connected to the t...

Страница 4: ...the fans when the control panel is switched on 2 12 Fan PD Switch This terminal is used to receive an input signal from external air pressure switches or external current monitors This terminal is li...

Страница 5: ...panel is checking the integrity of the gas installation upon start up GREEN proving the gas line do NOT operate any appliances Test Fail LED Under normal working conditions this LED is off When the p...

Страница 6: ...MS integration The Merlin 1000VW can be integrated with a BMS to make or break a circuit on gas on gas off valve open or valve closed This will tell the BMS whether or not the room has use of the gas...

Страница 7: ...acia of the Merlin 1000VW labelled Fill Time and Prove Time They are factory set in the off position Fill and prove time can be changed by turning the relevant dip switch to on position Fill time Off...

Страница 8: ...ns and Fire Alarm input wired in series purchased separately VOLT FREE INPUT 10 Methane CO or LPG Detector power supply and volt free input purchased separately CO2 Monitor purchased separately VOLT F...

Страница 9: ...ww snsnorthern com info snsnorthern com South East Division Tel 44 0 1702 291 725 Fax 44 0 1702 299 148 south snsnorthern com Rev Date Author Description 01 20 01 2017 S S Northern BT Merlin 1000VW Pr...

Отзывы: