![S&P TH-MIXVENT Series Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/sandp/th-mixvent-series/th-mixvent-series_quick-start-manual_3514874001.webp)
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
EC 22 N BLANCO
22
35
EC 30 N BLANCO RAL 9016
30
34
EC 45 N BLANCO
45
33
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
ECA 22 BLANCO RAL9016
22
39
ECA 30 BLANCO RAL9016
30
39
ECA 36 BLANCO RAL9016
36
38
ECA 45 BLANCO ACUSTICA
45
37
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
ECA 22 RA BLANCO RAL 9016
22
41
ECA 30 RA BLANCO RAL 9016
30
41
ECA 36 RA BLANCO RAL 9016
36
39
ECA 45 RA BLANCO RAL 9016
45
39
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
SILEM KIT 22
22
47
SILEM KIT 30
30
47
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
EC HY 6/45 BLANCO RAL 9016
6/45
33
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
ECA HY 6/45 BLANCO RAL 9016
6/45
37
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
ECA HY 6/45 RA BLANCO RAL 9016
6/45
39
Airflow
﴾m3/h﴿
Weighted acoustic
attenuation ﴾dB﴿
SILEM KIT HY 125
6/45
39
Airflow ﴾m3/h﴿
*BEHC 10/45/105:HYGRO 10/45/10
10‐45‐105
*BEHC 10/45/120:HYGRO 10/45/12
10‐45‐120
*BEHC 10/45/135:HYGRO 10/45/13
10‐45‐135
BEHC 10‐40/90
10‐40‐90
Airflow ﴾m3/h﴿
BEHW‐5/30
5‐30
Airflow ﴾m3/h﴿
BEHS 10/40
5‐40
BEHS 10/45 Bouche Hygro 10/45
5‐45
BEHS 5/40 Bouche Hygro 5/40
5‐40
Airflow ﴾m3/h﴿
BEHT 15/100
15‐100
BEHT 15/50
15‐50
BEHT 15/75
15‐75
Roof mounted mixed flow fans
TH‐MIXVENT Series
English
This instruction manual contains important information and must be read
carefully by competent persons prior to any handling, transport, inspection or
installation of this product. Every care has been taken in the preparation of the
instructions and information; however, it is the responsibility of the installer to
ensure the system complies with relevant national and international regulations,
especially safety. The manufacturer, Soler & Palau Sistemas de Ventilación S.L.U.
accepts no responsibility for breakages, accidents or any inconvenience caused
by failure to comply with the instructions contained in this manual.
The fan units referred to in this manual have been manufactured in accordance
with rigorous quality control and International standard ISO 9001. Once the
product has been installed, this manual to be retained by the end user.
The packaging used for this fan unit has been designed to support normal
transporting conditions. The fan unit must always be transported in its original
packaging as not doing so could deform or damage the product. Do not
accept delivery if the fan is not in its original packaging or shows clear signs of
having been damaged.
Do not place heavy weights on the packed product and avoid impact damage.
Any lifting equipment must be safe and of suitable capacity for weight and size.
Special attention may be required to ensure fan assembly does not distort or
tilt as weight distribution may vary. Never lift a product by pulling it by the
wires or terminal casing. Likewise, no pressure should be applied on the
propeller, turbine or safety grid while manipulating the product.
Storage must be in a safe, flat, controlled environment to prevent damage,
especially from water, sand, dust, moisture, corrosion, temperature until it is
installed in its final location. Recommend that duct connections ﴾inflow and
outflow﴿ are closed to avoid dust/debris entering the equipment. These data
may also apply to an installed fan, which is not put into operation for extended
period.
Installation must be carried out by qualified persons acting in accordance with
all safety precautions applicable and as required by law, regulations and
standards in the country applicable.
All fan units are designed and manufactured in accordance with EC Directive.
Safety guard accessories are available from S&P if required due to specific
installation.
Working ambient temperature for fan unit equipment should not be exceeded
typically this will be within ‐20°C to +40°C, unless stated otherwise.
This fan unit must not be used in explosive or corrosive atmospheres.
If the fan unit is to extract air from premises where a boiler or other
combustion appliance is installed, make sure that the room has sufficient air
intakes to assure adequate combustion.
This appliance can be used by children aged from 8 years and above and
persons with reduced physical, sensory or mental capabilities or lack of
experience and knowledge if they have been given supervision or instruction
concerning use of the appliance in a safe way and understand the hazards
involved. Children shall not play with the appliance. Cleaning and user
maintenance shall not be made by children without supervision
Fan unit equipment should be electrically isolated and locked out before any
work started.
The Installer, User is responsible for ensuring that the fan unit is installed,
operated and serviced by qualified personnel, acting in accordance with all
safety precautions applicable and as required by law, regulations and
standards in the country applicable.
Safety protective clothing, equipment, hearing protection, and tools may be
required.
Transport and handling
Storage
Important information for the
safety of installers and users
Safety during installation
required.
Before any installation work is started, ensure that fan unit equipment is correct
for application. Location for installation is solid, level, flat and suitable for
mounting fan unit assembly.
Fan unit should be located in position, and assembled with any accessory
equipment supplied, on relevant mounting, anti‐vibration mountings, safety
p r o t e c t i o n g u a r d s , o n a s o l i d l e v e l b a s e t o a v o i d a n y d i s t o r t i o n a n d
misalignment and with correct air direction as shown on nameplate. Fan unit
should then be levelled on any anti‐vibration mountings. Flexible connectors
must be taught to ensure no disruption to air flow, especially on inlet to fan
unit.
Make sure there are no loose elements near the fan unit. When the fan unit is
mounted in a duct, check that it is clean of any elements and exclusively used
for ventilation system.
The electrical installation must include a double pole switch with a contact
clearance of at least 3 mm, correctly sized and in accordance with the electrical
standards of the country of installation.
For electrical connections follow the wiring diagram “Fig.A” indicated in this
manual.
The fan unit classified as Residential Ventilation Unit with control factor 0,65
have to comply with the requirements of the European Directive 2009/125 and
must be installed following the local demand control definition given in the
regulation nº1253/2014 ﴾See fig.B as example﴿.
Check fan unit equipment name plate data is appropriate to the location
electrical supply, especially Voltage, Frequency, Phase, Amps, speed are correct.
Check earth connections, electrical terminations and terminal box lid, with any
seals, if fitted, are correct.
In compliance with Machine Directive, if the fan unit is accessible to operators
and is a health and safety risk, adequate protection must be fitted, information
for safety equipment, including guards, can be found in S&P accessories
catalogue.
Check all rotating parts have free, unobstructed movement.
Check there are no foreign bodies inside the fan unit or that can be drawn into,
or fall into fan unit.
Check the structure is complete and has no damage. Check installation and
area is safe and energise fan unit and start motor.
Check that the impeller and airflow direction is correct, and there are no
unusual vibrations.
Check current does not exceed fan equipment nameplate data.
If any of the electrical safety devices blow, the fan unit must be quickly
disconnected from the mains supply. The whole installation should be carefully
checked before trying to start up the fan again. After two hours of operation,
check that all fixings are tight and adjust if necessary.
Maintenance/repairs must be carried out by competent and local regulations.
Fan unit equipment should be electrically isolated and locked out before any
work started.
Fan unit equipment should be regularly cleaned, frequency depending upon
service load and application, but no less than every year. Cleaning should
include all areas where dust can accumulate in the fan equipment.
Special attention should be made to any unusual sounds, vibration or
temperature. If any problems are detected the fan unit equipment should be
stopped immediately and cause inspected. The impeller and blades should be
regularly checked for damage that could cause imbalance in the moving parts.
Start up
Maintenance
Recycling
In accordance with EEC Standards and our responsibility for future
generations, we are obliged to recycle all the materials we can.
Therefore, please deposit all waste material and packaging in their
corresponding recycling containers and hand in the replaced units
to the nearest handler of this type of waste product.
The fan unit is mainly made of steel, copper, ferrite, aluminium and plastic.
These components should be recycling in the following categories:
‐ Steel and iron
‐ Aluminium
‐ Non‐ferrous metals
‐ Plastics
‐ Insulating materials
‐ Cables
‐ Electronic scrap
To clarify any questions regarding S&P products contact your local distributor.
For its location and to obtain the EU Declaration of Conformity certified
technical data sheet and copy of this instruction manual, see our web site
www.solerpalau.com.
ErP data: EN 1253/2014
Содержание TH-MIXVENT Series
Страница 1: ...Roof mounted mixed flow fans TH MIXVENT Series...
Страница 2: ...12 11 2019 08 42 16 2 10...
Страница 3: ...12 11 2019 08 42 16 3 10...
Страница 4: ...12 11 2019 08 42 16 4 10...
Страница 5: ...Airflow m3 h Weighted acoustic attenuation dB 12 11 2019 08 42 16 5 10...
Страница 10: ...ErP data EN 1253 2014 12 11 2019 08 42 16 10 10...
Страница 11: ......