English
21
Installation
Step-by-step installation
STEP 1
Select a location
Location requirements:
• A solid, level surface without carpeting or flooring that may obstruct ventilation
• No direct sunlight
• Adequate room for ventilation and wiring
• Ambient temperature always higher than the freezing point (32 °F / 0 °C)
• Away from heat sources
STEP 2
Remove the shipping bolts
Unpack the product package and remove
all shipping bolts.
1.
Loosen all shipping bolts on the rear of
the machine using the spanner.
NOTE
An adjustable wrench or 10 mm open-
end wrench is required for removing the
shipping bolts.
2.
Fill the holes with the supplied plastic
bolt caps.
Keep the shipping bolts for future use.
WARNING
Packaging materials can be dangerous to children. Dispose all packaging material (plastic
bags, polystyrene, etc.) out of children’s reach.
Untitled-3 21
2019-07-26 PM 12:19:01