18
/
66
Flight Case:
According to the customer's requirements, the flightcase with waterproof function is
specially designed for convenient transportation and convenient loading and
unloading; as shown in Picture 5-17.
Picture 5-16 Flight Case
Chapter 6 VMR-O Installation Process
This chapter mainly introduces the installation process of the VMR-O HD series
products and guides the customer to install the products correctly. The VMR-O HD
series products generally adopt two installation methods: stacking and hangig, which
are described in detail in this chapter.
6.1 Place Installation
In the case of frequent replacement of the screen use location, the installation method
of the seat is usually adopted. The company provides customers with a new floor
stand that can be quickly installed. The following is the step of quick installation of the
new floor stand.
6.1.1 Preparatory Work
Содержание VMR-O P3.9
Страница 1: ...1 66 Product Manual VMR O P3 9 ...
Страница 34: ...34 66 Appendix A Dimensional Drawing of Main Components A 1 VMR O VMR O P3 9 Flat Panel Curve Panel A 2 Flykit ...
Страница 41: ...41 66 C 5 Plastic hammer ...
Страница 49: ...49 66 ...
Страница 53: ...53 66 F8 Press the lock handle according to the mark to lock the cabinet as shown below ...
Страница 55: ...55 66 G4 Open the back cover of the power supply cabinet as shown below as shown below ...