
3
.
Installing the Product
104
English 8/2020. Rev 0.3
3.10.14 Reinstall the Front Door
1.
Reinstall the front door to cover the battery rack and prevent further access to high voltage parts of the SMU and SMPS
Assembly.
2.
Align the hinges on the rack frame and front door and slide the door down.
Figure 3-129: Reattaching the Front Door
3.
Reattach the earth cable from the rack frame to the front door.
Figure 3-130: Reattaching the earth cable.
4.
Close and lock the front door using the provided key. Do not misplace the key.
Содержание U6A4
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 128S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 60: ...3 Installing the Product 42 English 8 2020 Rev 0 3 Figure 3 33 Fuse Busbar Left Assembly Fuse Cover ...
Страница 79: ...3 Installing the Product English 8 2020 Rev 0 3 61 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 116: ...3 Installing the Product 98 English 8 2020 Rev 0 3 Figure 3 126 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 125: ...Memo ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...www SamsungSDI com ...