
E-
61
EHP Power Consumption Inspection
Checking Inspection Result (without SIM/PIM)
1
Click [EHP Power Consumption Inspection]
[Check
inspection result] when DMS2 web page menu screen
appears.
Channel setting by indoor unit must be done in advance.
2
Set date when inspection result screen appears.
Select year/month/day in order.
Based on DMS2 time, You can check up to 365 days of
inspection results.
3
Enter power consumption value during the period.
Virtual channel is value which is set in channel setting by
indoor unit.
4
Click [Calculate].
Power consumption by indoor unit during the period will
be displayed.
1
3
4
2
MIM-D00A_DMS2_IB_E 32140-2.indd 61
2010-05-17 ソタタ・10:42:24