Disassembly and Reassembly
Samsung Electronics
247
■
ERV PLUS
No
Parts
Procedure
Remark
1
ERV
(Energy Recovery
Ventilator)
1) Stop the air conditioner operation and
shut off the main power.
2) Remove the unit from ceiling suspension.
(Disassembly is not required when Fan,
Motor, Element, Filter replacement or
cleaning.)
2
Cover Element
1) Remove the 2 bolts of the Cover Element.
(Use +Screw Driver.)
2) Find the Element and 2 Dust Filters.
3
Ass’y Element
Ass’y Filter
1) Detach Element and Filter from the unit.
Make sure detach the Filter before the
Element.
2) There are 2 Element within the product.
– All the procedure has to be verified because the cover should not open when the unit is installed.
Содержание AM056FN2DEH Series
Страница 526: ...PCB Diagram and Parts List 526 Samsung Electronics 5 1 4 360 cassette MAIN PCB 1 2 3 4 5 6 7 8 9 10 11 12 13...
Страница 540: ...PCB Diagram and Parts List 540 Samsung Electronics 5 1 11 Duct type HSP BLDC PCB AM112 128 140FNHDEH 1 2 3 4...
Страница 593: ...PCB Diagram and Parts List Samsung Electronics 593 OAP DUCT AM220 280 NEPEH EU Cont BLDC Driver PCB cont 6 5 4 3 2 1...
Страница 643: ...Wiring Diagram Samsung Electronics 643 AMSSSMNFDEHS This Document can not be used without Samsung s authorization...
Страница 654: ...654 Samsung Electronics 6 1 27 OAP Duct AM140MNEPEH EU This Document can not be used without Samsung s authorization...
Страница 655: ...Samsung Electronics 655 6 1 28 OAP Duct AM140MNEPEH EU This Document can not be used without Samsung s authorization...
Страница 656: ...656 Samsung Electronics 6 1 29 OAP DUCT AM220 280 NEPEH EU This Document can not be used without Samsung s authorization...
Страница 657: ...Samsung Electronics 657 6 1 30 V AHU AMSSSJNZDCHS This Document can not be used without Samsung s authorization...
Страница 660: ...660 Samsung Electronics AM280JNPDKH TK AM280RNPDKH EU This Document can not be used without Samsung s authorization...