ii
English 8/2020. Rev 0.3
General Instructions
Please be aware that a battery presents a risk of electrical shock including high short-circuit current. Follow
all safety precautions while operating the batteries.
Remove watches, rings, and other metallic accessories.
Use tools with insulated handles in order to avoid inadvertent short circuits.
Wear rubber gloves and safety boots.
Do not put tools or any metal parts on the top of the batteries.
Disconnect charging source and load before connecting or disconnecting terminals.
Use proper lifting means when moving batteries and wear all appropriate safety clothing and equipment.
Batteries must be handled, transported and recycled or discarded in accordance with federal, state, and local
regulations. Do not dispose of the batteries in a fire because they can explode.
Do not open or mutilate the batteries.
Only authorized, trained technicians should perform annual preventive maintenance.
Only qualified personnel who are familiar with the batteries and safety precautions should perform
installation or maintenance of the battery.
Do not allow unauthorized personnel to contact the batteries.
Safety Precautions
The following precautions provide general safety guidelines that should be followed when working with or
near the Energy Storage System (ESS). Complete safety parameters and procedures are site-specific and
should be developed by the customer for the installation site.
Review and refer to all safety warnings and cautions in this manual before installation.
Build a clear, permanent, restricted access area around the system.
Only authorized, adequately trained electrical operators should be able to access the system.
The interior design of this equipment must be considered a “no-go area except for non-qualified personnel
who are familiar with the batteries and safety precautions,” depending on the location. Consult local codes
and applicable rules and regulations to determine permit requirements. If required, mark enclosures
appropriately before beginning work.
Содержание 93PM
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 78: ...3 Installing the Product 60 English 8 2020 Rev 0 3 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 117: ...3 Installing the Product English 8 2020 Rev 0 3 99 Figure 3 130 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...Memo ...
Страница 129: ...www SamsungSDI com ...