Installing the Product
100
English 8/2020. Rev 0.3
3.10.10 DC Link Cable Connection
1.
Connect the ground cables.
Figure 3-131: Grounding Points (2 EA)
NOTICE
Connect the rack ground wire with an M12 screw
.
Rack ground screws and cables are not
factory-provided and must be provided by the installer or customer.
The fastening torque should be 30Nm (300kgf∙cm)
.
45 mm Pitch
Between Holes
Содержание 9395
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 78: ...3 Installing the Product 60 English 8 2020 Rev 0 3 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 117: ...3 Installing the Product English 8 2020 Rev 0 3 99 Figure 3 130 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...Memo ...
Страница 129: ...www SamsungSDI com ...