3
.
Installing the Product
Confidential
34
English 8/2019. Rev 0.0
Figure 3-10: Rear panel hooks (four)
3.
Arrange the rack frame after verifying that the holes in the frame and anchoring points are aligned.
4.
Connect four anchoring points on the bottom of the rack.
NOTICE
Anchor the frame with M16 bolts and nuts.
The fastening torque should be 140Nm / 1,425kgf cm.
Check the rack and other parts for distortion caused by unpacking.
Figure 3-11: Rack Anchoring Points (4 EA)
Bottom of the Rack Frame
Содержание 136S
Страница 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Страница 4: ...Confidential English 8 2019 Rev 0 0 ...
Страница 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Страница 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Страница 149: ...Confidential 3 Installing the Product English 8 2019 Rev 0 0 131 Figure 3 164 Cell Information ...
Страница 153: ...Confidential Memo ...
Страница 154: ...Confidential Memo ...
Страница 155: ...Confidential Memo ...
Страница 156: ...www SamsungSDI com ...