3
.
Installing the Product
Confidential
134
English 8/2019. Rev 0.0
3.10.16
Switching on the MCCB
After powering on the battery system’s SMPS Assembly and SMU, and configuring the System BMS and the Rack
BMS according to the installation, check the indicator LED to determine whether the system status is normal. Refer
to the “Product Specification” and “Operation and Maintenance Manual” for information on the indicator LED.
CAUTION
Follow the instruction and guidelines for the UPS on connecting the battery to the UPS before
switching on the MCCB.
The MCCB in the SMU should be in the “TRIP” position during installation.
Figure 3-169: MCCB Handle in Trip Position
Shift the handle of the MCCB to “OFF.”
Figure 3-170: MCCB Handle in Off Position
Then shift the handle to “ON” to connect the battery system to the UPS DC link.
Figure 3-171: MCCB Handle in On Position
Содержание 136S
Страница 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Страница 4: ...Confidential English 8 2019 Rev 0 0 ...
Страница 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Страница 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Страница 149: ...Confidential 3 Installing the Product English 8 2019 Rev 0 0 131 Figure 3 164 Cell Information ...
Страница 153: ...Confidential Memo ...
Страница 154: ...Confidential Memo ...
Страница 155: ...Confidential Memo ...
Страница 156: ...www SamsungSDI com ...